Arkansas

Arkansas

Cubic Yards 2,100
16 Bridge Decks

Arkansas Highway Department put together a robust Latex Overlay plan on I-555. This project included 16 bridge decks that were in poor condition with over 50% of the decks surface patched. This project was specified to have a surface mill followed by hydro-demolition then surface prepared with a 7,500 PSI pressure washer before the installation of the Type I Latex Modified Concrete. This was one of the biggest LMC overlay jobs in the state of Arkansas. The project had great success and these latex overlays are estimated to be in service for 30 years.